Alligator cracking
Aging surface lots craze into interconnected cracks — the precursor to potholes.
Your parking lot or garage is the first thing tenants and customers see. We scope the right system for the surface's condition — preserve, restore, or protect — and on parking structures we add traffic-topping membranes, expansion-joint repair, and deck-drain work so the slab and the tenants below stay dry.
Aging surface lots craze into interconnected cracks — the precursor to potholes.
Dim stalls and missing ADA markings hurt curb appeal and compliance on lots and decks alike.
On parking structures, failed membranes and joints let water reach the slab — spalling concrete, corroding rebar, and dripping into tenant spaces below.
Crack seal plus sealcoat for sound lots — the cheapest path to multi-year extension, matched to the pavement's age.
Full overlay for worn surface lots with a sound base. Wear-course system chosen for the traffic and climate, then striped fresh.
Traffic-bearing membrane systems, expansion-joint repair, and spall patching for parking structures — scoped level-by-level and matched to the deck's exposure.
Crisp stalls, fire lanes, ADA stalls, level-numbering, and directional wayfinding applied to current code, on lots and inside decks.
Documented, repeatable, and built into the close-out package on every job.
Yes — most retail and office jobs run Friday night through Sunday so the lot is back open for Monday morning.
Yes. Garage work is phased level-by-level with traffic control, containment, and drip protection so the levels above and below stay in service throughout the project.
Our crews are a blend of Harkin staff and vetted subcontract partners, all trained through the Harkin Certification process and separately certified by every product manufacturer we install. That's how we can bring the right system to occupied lots and parking structures instead of forcing one product to fit every job.
We'll walk the site, document the conditions, and scope a system that fits the surface, the traffic, and the timeline.
Or use the full assessment form