Applications · Industrial & facility

Industrial & facility: Heavy traffic, oil exposure, tight operating windows.

Industrial yards see point-loaded forklifts, tractor-trailers, and chemical exposure. We scope overlay and patching systems from our approved product portfolio, matched to the load, the chemistry, and the production schedule.

100K+LBS
Load capacity on engineered systems
24–48HRS
Cure to full traffic
0
Production days lost on most jobs
Problems we see

Where industrial & facility surfaces fail.

Point-load failure

Trailer landing gear and forklift wheels punch through standard mixes.

Chemical attack

Oils, solvents, and battery acid degrade conventional asphalt.

No downtime allowance

Production schedules don't pause for paving.

What we put down

The system for industrial & facility.

Heavy-load overlays

Reinforced overlay systems selected for trailer and forklift loads at your facility.

Chemical-resistant systems

Fuel- and chemical-resistant wear courses selected for the exposure — spill zones, fuel islands, wash bays.

Phased night work

Work scheduled around production windows — dock by dock, lane by lane.

Outcomes

What you get when the work is done.

Documented, repeatable, and built into the close-out package on every job.

  • Yard surface that holds up to the load
  • Chemical-resistant wear course
  • Zero production disruption
Questions

Industrial & facility questions, answered.

Can you sequence work dock-by-dock?+

Yes. Most warehouse and distribution jobs run dock-by-dock so loading operations never fully stop.

Who actually does the work?+

Our crews are a blend of Harkin staff and vetted subcontract partners, all trained through the Harkin Certification process and separately certified by every product manufacturer we install. That's how we can bring the right system to active industrial facilities instead of forcing one product to fit every job.

Get started

Tell us about your industrial & facility site.

We'll walk the site, document the conditions, and scope a system that fits the surface, the traffic, and the timeline.

Or use the full assessment form